Free building report
2643 N Mildred Ave
Winter habitability score Open City violation records are on file — read the list, not just the score
Renter reviews
Firsthand and anonymous. Renter opinions are separate from the city records below.
No renter reviews here yet. If you’ve lived at 2643 N Mildred Ave, yours could be the first.
Do you live here?
One tap helps other renters. The full building record stays right below.
Thanks for looking. The full record is right below.
No problem. The full record is right below.
Thanks, neighbor. Share how it’s really been — one tap on the stars is all it takes.
Thanks. Share how it really was — one tap on the stars is all it takes.
Sure, I’ll share
All open City violation records (2)
2 of 2 open City violation records are from the last 24 months (since November 2024), shown newest first.
- Open
CN194029 — PROVIDE
AS PER SECTION 17-2-0207-B.13, & 17-13-0900, A GROUP LIVING NOT OTHERWISE CLASSIFIED IN PARCELS RT-4 REQUIRES A SPECIAL USE PERMIT.AT THE TIME OF INSPECTION, IT WAS DETERMINED THAT THE CURRENT OWNERS ARE ALLOWING INTERNATIONAL STUDENTS RESIDE IN THE FRONT BUILDING.1.-THE FIRST FLOOR AND BASEMENT HAVE BEEN DUPLEXED TO A TOTAL OF 4 BEDROOMS.2.-THE SECOND FLOOR AND ATTIC HAVE BEEN DUPLEXED TO A TOTAL 4 BEDROOMS, ONE OF THE BEDROOMS ACCEPTS 2 STUDENTS.3.-THE TOTAL OCCUPANCY IS 8 TO 9 STUDENTS BETWEEN THE 2 DUPLEXED APARTMENTS.NO SPECIAL USE PERMIT IS ON FILE.
- Open
CN194029 — PROVIDE
AS PER SECTION 14A-4-401.1, IT'S UNLAWFUL TO CONSTRUCT, ENLARGE, REHABILITATE OR CHANGE THE OCCUPANCY CLASSIFICATION WITHOUT OBTAINING A PERMIT.AT THE TIME OF INSPECTION, IT WAS OBSERVED THAT THE FOLLOWING, BUT NOT LIMITED TO, ALTERATIONS WERE PERFORMED AT THE INTERIOR OF THE FRONT BUILDING.1.-THE FIRST FLOOR UNIT WAS REHABILITATED AND DUPLEXED WITH THE BASEMENT AREA. THE 1ST FLOOR LIVING ROOM AREA WAS PARTIALLY REMOVED AND A WOOD STAIR SYSTEM ADDED, PARTITIONS WERE ERECTED TO FORM BEDRROMS, MECHANICAL ROOM AND A FULL BATHROOM INSTALLED.2.-THE SECOND FLOOR UNIT WAS REHABILITATED AND DUPLEXED WITH THE ATTIC. THE 2ND FLOOR ENTIRE DINING ROOM AREA CELING WAS REMOVED AND A STEEL STAIR SYSTEM ADDED TO CONNECT THE ATTIC, PARTITIONS WERE ERECTED TO FORM BEDROOMS AND A FULL BATHROOM WAS INSTALLED.DUE TO THE COMPLETE REHABILITATION AND THE DUPLEXING OF THE ORIGINAL UNITS, A DETAILED ARCHITECTURAL PLAN IS NOW REQUIRED. THE PLANS MUST INCLUDE ALL CONSTRUCTION DISCIPLINES, ELECTRICAL, PLUMBING, HVAC, STRUCTURAL AND INTERIOR CARPENTRY. A SUBSEQUENT PERMIT SEARCH DIDN'T IDENTIFY ANY PERMITS ASSOCIATED WITH THE REHABILITATION AND THE DUPLEXING OF THE APARTMENTS INSIDE THE FRONT BUILDING'S INTERIOR.
About these City violation records
From the City of Chicago Building Violations dataset description: “…informational only and does not necessarily reflect the current condition of the building or property. The dataset contains cases where a respondent has been found to be liable as well as cases where the respondent has been found to be not liable.”
311 complaints (24 months)
No matching 311 complaints in the last 24 months.
Timeline
- Open City violation record — CN194029 PROVIDE
- Open City violation record — CN194029 PROVIDE
Recently closed / other violations (sample)
No recent closed violations in the sample.
Around 2643 N Mildred Ave
- Lincoln Park building violations and 311 complaints
- DePaul off-campus housing: Lakeview and Lincoln Park renter guide
Nearby buildings with open City violation records
Nearby addresses that also have open City violation records in the City of Chicago Building Violations dataset (22u3-xenr), by distance. Open each one for its current free report.
How the winter score is calculated
- Start at 100 (better = higher).
- Minus up to 40 for open heat/boiler-related building violations (12 pts each).
- Minus up to 45 for other open building violations (2 pts each, plus extras above 20 and 100 open).
- Minus up to 20 for rodent-related open violations and 311 rodent complaints (4 pts each).
- Minus up to 15 for recent 311 building complaints (2 pts each).
- Extra −10 if 3+ open heat-related violations.
- Chicago 311 takes no-heat complaints, but the City's public 311 dataset does not publish them as a separate type, so heat here comes from open Department of Buildings heat-related violations (codes/descriptions, e.g. CN132016 HEAT UNIT ADEQUATELY). 311 building complaints are counted separately, not as heat.
- Public records only — not an inspection, appraisal, or legal advice.
Sources: City of Chicago Building Violations (data.cityofchicago.org/d/22u3-xenr); City of Chicago 311 Service Requests (data.cityofchicago.org/d/v6vf-nfxy). Data: City of Chicago (chicago.gov). Data as of November 21, 2026 at 9:23 AM CT.
ScoutMyBuilding summarizes publicly available City data. It is informational only — not legal advice, not a housing inspection, and not a guarantee of current building conditions. City records may be incomplete, delayed, or inaccurate. Always verify with the City of Chicago Department of Buildings, 311, and your own walkthrough before signing a lease.
“This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one’s own risk.” Required by the City of Chicago Data Terms of Use.